Inward to Fixture Loading

Complete pre-processing workflow — from initial material inspection through alkaline cleaning, ultrasonic washing, and final fixture preparation.

Inward Inspection

Inward Inspection

Inward Inspection Sheet

Inward Inspection Sheet

Alkaline Cleaning Machine

Alkaline Cleaning Machine

Ultrasonic Washing

Ultrasonic Washing

After Ultrasonic Washing

After Washing Preparation

Ready For Fixturing

Ready For Fixturing

Loading Pattern

Loading Pattern (Fixture)

Fixture Loading

Fixture Loading

Ready For Fixturing

Nitriding

Loading Pattern

Final Inspection

Fixture Loading

Dispatch